Client satisfaction is our main business. We believe that effective project consultation, management and evaluation are the keys to client satisfaction. Through these, we vouch to deliver services in the best and most practical way possible. Our past and current projects will attest to how much we greatly value our clients. By equally and fairly treating all clients, whether big or small, we have gone beyond our goals G7 Heavylift & Logistics Corporation

 

Heavy Lift Services Projects

 

Mapalad Energy Generating Corp.

  • Jacking Up and Skidding of 36MT Generator I from Multi axle to foundation 4.0 m high
  • Transport of Engine I from Gerona yard to MEGC Power Plant site
  • Jacking and Skidding of 96MT Engine I to foundation 4.0m high

MERALCO

  • Handling Of Meralco Trafo From Silang, Cavite Substation To Tegen, Romualdez St. Manila Substation
  • Transformer has a height of 4.70 meters and weighed approximately 70 tons. Main equipment used was our 2 x 4-axle lines Goldhofer Trailer with Dropdeck.
  • Handling of 3 135TONS X 300MVA MERALCO power transpormers
  • Direct Receiving of 3 x 300MVA MERALCO Power transformer at Harbor Center, Port of Manila
  • 135 Tons Power Transformer mounted on stools at temporary laydown area
  • Transport of 135 Tons Trafo to Paco MERALCO Substation.
  • Skidding and Spotting of 135 Tons Power transformer to Foundation

JG Summit Petrochemical Corporation

  • Direct receiving of five (5) 120Tons Generator Sets. Using 8 lines Goldhofer multi-axle trailer.
  • Lct Operations / Roll On Roll Off Transport To Foundation Site Skidding / Spotting To Foundation Area

Lima Subic Project

  • Positioning of 21 lines (10-11 lines side by side) multi axle trailer
  • Direct Receiving of 174.2 tons generator stator from vessel onto 21 lines (10-11 lines side by side) multi axle trailer
  • Transport of 174.2 tons generator stator from vessel to staging area.

MERALCO Project

  • Direct Receiving of transformer from vessel to multi axle trailer
  • Hauling of transformer to Meralco Substation using multi axle trailer
  • Spotting of Power Transformer to Meralco Substations
  • Unloading/Spotting to foundation 3.7 meters high

DPWH Project

  • DPWH Cagayan de Oro Depot
  • DPWH Cotabato Depot
  • DPWH Iloilo Depot
  • DPWH Laguna Depot
  • DPWH Mindoro Depot
  • DPWH Palawan Depot
  • DPWH Quezon Depot
  • DPWH Romblon Depot
  • DPWH Quezon City Depot 

Meister

  • Loading of kiln shell onto G7 Heavylift designed chassis
  • Direct Receiving of Kiln shell to high bed trailer truck
  • Transport of kiln shell using G7 designed chassis

Eurocopter

  • I unit Helicopter lifted by 16 tonner Tadano, truck mounted crane thru its propeller as lifting lug
  • Positioning of 1 x 20 Lowbed & I-Unit crane w I-unit Helicopter for Unloading
  • Unloading of I-unit Helicopter by truck mounted crane to its temporary laydown area

CIGI - ERS International

  • Lifting of tanks by truck mounted crane to load onto container, assisted by 5 tonner forklift
  • Positioning of tanks for skidding, using roller skid
  • Skidding of tank inside container, assisted by 5 tonner forklift for pushing tanks inside the container

Ravago Equipment Rentals, Inc.

  • Lifting of Boom onto G7 Goldhofer multi-axle trailer
  • Loading of Boom onto G7 Goldhofer multi-axle trailer
  • Transport of Boom usingG7 Goldhofer multi-axle trailer

Hedcor-Aboitiz Sibulan, Davao Hydroelectric Project

  • Transport downhill of 2 x 95 tons Generator Set

National Grid Corp. of the Phils. – Davao Project

  • Transport uphill of 120 tons Power Transformer

 

G7 Heavylift & Logistics Corporation is one of the best heavy lift companies in the Philippines.

Client satisfaction is our main business. We believe that effective project consultation, management and evaluation are the keys to client satisfaction. Through these, we vouch to deliver services in the best and most practical way possible. Our past and current projects will attest to how much we greatly value our clients. By equally and fairly treating all clients, whether big or small, we have gone beyond our goals G7 Heavylift & Logistics Corporation

Mapalad Energy Generating Corp.

  • Jacking Up and Skidding of 36MT Generator I from Multi axle to foundation 4.0 m high
  • Transport of Engine I from Gerona yard to MEGC Power Plant site
  • Jacking and Skidding of 96MT Engine I to foundation 4.0m high

MERALCO

  • Handling Of Meralco Trafo From Silang, Cavite Substation To Tegen, Romualdez St. Manila Substation
  • Transformer has a height of 4.70 meters and weighed approximately 70 tons. Main equipment used was our 2 x 4-axle lines Goldhofer Trailer with Dropdeck.
  • Handling of 3 135TONS X 300MVA MERALCO power transpormers
  • Direct Receiving of 3 x 300MVA MERALCO Power transformer at Harbor Center, Port of Manila
  • 135 Tons Power Transformer mounted on stools at temporary laydown area
  • Transport of 135 Tons Trafo to Paco MERALCO Substation.
  • Skidding and Spotting of 135 Tons Power transformer to Foundation

JG Summit Petrochemical Corporation

  • Direct receiving of five (5) 120Tons Generator Sets. Using 8 lines Goldhofer multi-axle trailer.
  • Lct Operations / Roll On Roll Off Transport To Foundation Site Skidding / Spotting To Foundation Area

Lima Subic Project

  • Positioning of 21 lines (10-11 lines side by side) multi axle trailer
  • Direct Receiving of 174.2 tons generator stator from vessel onto 21 lines (10-11 lines side by side) multi axle trailer
  • Transport of 174.2 tons generator stator from vessel to staging area.

MERALCO Project

  • Direct Receiving of transformer from vessel to multi axle trailer
  • Hauling of transformer to Meralco Substation using multi axle trailer
  • Spotting of Power Transformer to Meralco Substations
  • Unloading/Spotting to foundation 3.7 meters high

DPWH Project

  • DPWH Cagayan de Oro Depot
  • DPWH Cotabato Depot
  • DPWH Iloilo Depot
  • DPWH Laguna Depot
  • DPWH Mindoro Depot
  • DPWH Palawan Depot
  • DPWH Quezon Depot
  • DPWH Romblon Depot
  • DPWH Quezon City Depot 

Meister

  • Loading of kiln shell onto G7 Heavylift designed chassis
  • Direct Receiving of Kiln shell to high bed trailer truck
  • Transport of kiln shell using G7 designed chassis

Eurocopter

  • I unit Helicopter lifted by 16 tonner Tadano, truck mounted crane thru its propeller as lifting lug
  • Positioning of 1 x 20 Lowbed & I-Unit crane w I-unit Helicopter for Unloading
  • Unloading of I-unit Helicopter by truck mounted crane to its temporary laydown area

CIGI - ERS International

  • Lifting of tanks by truck mounted crane to load onto container, assisted by 5 tonner forklift
  • Positioning of tanks for skidding, using roller skid
  • Skidding of tank inside container, assisted by 5 tonner forklift for pushing tanks inside the container

Ravago Equipment Rentals, Inc.

  • Lifting of Boom onto G7 Goldhofer multi-axle trailer
  • Loading of Boom onto G7 Goldhofer multi-axle trailer
  • Transport of Boom usingG7 Goldhofer multi-axle trailer

Hedcor-Aboitiz Sibulan, Davao Hydroelectric Project

  • Transport downhill of 2 x 95 tons Generator Set

National Grid Corp. of the Phils. – Davao Project

  • Transport uphill of 120 tons Power Transformer

G7 heavy lift services and Logistics BIO-DATA ,AUGUSTUS CAEZAR R. GAN

 

  • Graduated Cum Laude from The De La Salle University, Class of 1970, with Degrees in Liberal Arts-Commerce, Bachelor of Arts Major in History-Political Science and Bachelor of Science in Business Administration, Major in Business Management
  • Gold Medal Recipient in General Excellence Awards
  • 1970-1971, employed in the Central Administration Dept., Music Division of SIEMENS in Hamburg, Germany and PHILIPS in Baarn, The Netherlands
  • 1971-1977, hired by NESTLE PHILS. as EXECUTIVE TRAINEE reporting to the Marketing Manager, a Swiss National. Handled Positions in Marketing and Sales
  • 1977, hired by RFM CORPORATION as SALES MANAGER for their Grocery Products Division
  • 1978, started G & G TRADING CORPORATION, engaged in retail sales of grocery products at the Bataan Export Processing Zone in Mariveles, Bataan, Philippines.
  •  Commenced Trucking Business serving the import and export requirements of the locators at the Zone
  • 1983, opened main office in Manila, while retaining the Bataan office as branch office
  • 1990, transferred main offices at the Port Area, and created G & G FREIGHT PHILS., INC., initially offering trucking services, mainly to EPZA enterprises
  • 1992, expanded its operations into Customs Clearance
  • 1994, diversified into International Freight Forwarding
  • 1996, started Project Cargo Management business
  • 2008 created G7 Heavylift & Logistics Corporation to mainly offer heavylift services for bulk and out-of-gauge cargo
  • Attended various Seminars/Short Courses in Management, Supervision, Leadership, Freight Forwarding, Transport and Cargo Handling.
  • Traveled abroad a number of times to meet foreign agents and clients and attended to foreign guests when they come to the Philippines
  • Attended international conferences the most recent of which is the Seminar on Heavylift and Transport in May 2010 in Singapore
  • Executive Vice President of EFFORT, PHILS. (ECOZONE FEDERATION OF FORWARDERS/BROKERS & TRUCKERS, PHILS) an Association of Service Providers at the various PEZA Enterprises since 1995 to 2009
  • Born Dec. 12, 1948, married with five (5) children, all professionals in their own right

GENERAL MANAGER AND PRESIDENT SEMINAR IN SINGAPORE

 

Mr. August Caezer R. Gan, President attended a Seminar on Heavy Transport and Lifting in Singapore on May 26-27, 2010. The seminar was conducted by Krabbendam Advies Service. Through trainings like this, Mr. Gan hopes to provide clients with the most updated and modern strategies and equipment related to the services offered by G7 Heavylift and Logistics Corp

 

G7 heavy lift and Logistics SPECIALIZED EQUIPMENT

 

Training and Acquisition of FIRST Brand-New Goldhofer Multi-axle Trailer in the Philippines, at Memmingen, Germany in 1996 With Engr. Harald Westner, Director Design and Development and Projects Management Team With Engr. Harald Westner Formal turnover of Goldhofer Trailer from Ms. Goldhofer and Härst Hafele (Sales Director Export, Goldhofer) With Ms. Goldhofer, Engr. Harald Westner, and Härst Hafele and Projects Management Team G7 HEAVYLIFT & LOGISTICS CORP