Project Management and Heavy Lifting

We are one of the leading Project Management companies in the Philippines which provide the best, prompt, and practical solutions to problems or challenges related to transport logistics.

You can find a list of our projects, companies and clients that we have served, date of project management and location.

DPWH - Project 2010

Logistics and Project Management date: November 09, 2010

  

Featuring

 

DPWH Cagayan de Oro Depot

DPWH Cotabato Depot

DPWH Iloilo Depot

DPWH Laguna Depot

DPWH Mindoro Depot

DPWH Palawan Depot

DPWH Quezon Depot

DPWH Romblon Depot

DPWH Quezon City Depot

MERALCO- Project 2011

Logistics and Project Management date: December 5-8, 2011

 

Featuring

 

HANDLING OF MERALCO TRAFO FROM SILANG, CAVITE SUBSTATION TO TEGEN, ROMUALDEZ ST. MANILA SUBSTATION

Transformer has a height of 4.70 meters and weighed approximately 70 tons. Main equipment used was our 2 x 4-axle lines Goldhofer Trailer with Dropdeck.

Mapalad Energy Generating Corp.

Project 2012

Logistics and Project Management date: November 5-14, 2012

 

Featuring

Jacking Up and Skidding of 36MT Generator I from Multi axle to foundation 4.0 m high.

Transport of Engine I from Gerona yard to MEGC Power Plant site.

Jacking and Skidding of 96MT Engine I to foundation 4.0m high.

MERALCO - Project

Logistics and Project Management date: July 21, 2011 to June 9, 2011

 

Featuring 

 Direct Receiving of transformer from vessel to multi axle trailer

Hauling of transformer to Meralco Substation using multi axle trailer

 Spotting of Power Transformer to Meralco Substations

NEWLY PURCHASED

DROPDECK - GOLDHOFER

First in the Philippines

 

 Featuring

THE FIRST BRAND NEW DROPDECK GOLDHOFER
IN THE PHILIPPINES

Technical Specifications: L-10.0m x W- 3.0m x H-.30m (+ 30cm)
G7 HEAVYLIFT

Meister - Project

Logistics and Project Management date: February, 2010

 

Featuring

 Loading of kiln shell onto G7 Heavylift designed chassis

 Direct Receiving of Kiln shell to high bed trailer truck.

  Transport of kiln shell using G7 designed chassis.

G7 Lima Subic - Project 2011 

Logistics and Project Management date: October 4, 2011

Featuring

 
 

Positioning of 21 lines (10-11 lines side by side) multi axle trailer

Direct Receiving of 174.2 tons generator stator from vessel onto 21 lines (10-11 lines side by side) multi axle trailer.

Transport of 174.2 tons generator stator from vessel to staging area.