G7 Lima Subic - Project 2011 

Logistics and Project Management date: October 4, 2011

Featuring

 
 

Positioning of 21 lines (10-11 lines side by side) multi axle trailer

Direct Receiving of 174.2 tons generator stator from vessel onto 21 lines (10-11 lines side by side) multi axle trailer.

Transport of 174.2 tons generator stator from vessel to staging area.